Parts
- 8 x cable tie base
- 8 x M5x16mm button head bolts
- 8 x M5 nyloc nuts
- 1 x light splitter cable
- 4 x reusable cable ties
Process
- Fit the cable tie bases to the interior of the S8 with the 16mm bolts, there are two sets of holes that run parallel down the back panel. Tighten them in place with a nut on the rear.
The left hand supports are for the light cable, and the right hand supports are for the irrigation pipe.
Install light splitter cable
Plug in the light splitter cable to the right hand side port of the control unit labelled '4' and run it down the left-hand side cable tie bases.
Secure with 4x reusable cable ties.
Previous: Control unit and power supply
Next: Extractor fan