Parts
- 8 x M5X16.B (16mm bolt)
- 8 x M5.NY.N (nyloc nut)
- 1 x V2S.LDPE (downpipe)
- 1 x 14MM.EP (pipe elbow)
- 1 x 14MM.EB (end stop)
- 1 x HOSE.2.5M (braided garden hose)
- 8 x CTB (Cable tie base)
Cable tie bases
Fit the cable tie bases to the interior of the S16 with M5x16 bolts (M5X16.B). The head of the bolt should sit flush in the cradle of the cable tie base. There are two sets of holes that run parallel down the back panel. Tighten them in place with M5 nyloc nuts (M5.NY) on the rear.
Irrigation downpipe
- Use some hot water to soften one end of the rigid pipe. Push fit the 14mm elbow to this end. Soften the opposite end and push fit the 14mm end plug.
- Thread approx. 10cm of the braided black hose through the lower hole in the rear panel.
- Soften the end of the braided hose and push-fit the elbow from step 1 to the braided hose end, inside the greenhouse.
- Align the elbow into the panel hole. The downpipe should align with the right hand side cable tie bases.
- Fasten the downpipe to the right set of cable tie bases with the reusable cable ties.
Previous: Extractor fans
Next: Shelf components