Parts
- Top side assemblies from step (previous)
- 2 x V2S.SA3 (clear side panel)
- 6.5m x V2S.GST (sealing trim)
- 2 x M5.NY (M5 nyloc nut)
- 2 x M5X30.B (M5 x 30mm button head)
- 2 x M5.PW (M5 penny washer)
Warning
Glazing edges are sharp. Please wear protective gloves when handling.
Process
- Remove the film from the outside edges of both faces of the side panels (V2.SA3). Slide the side panels into the sides of the greenhouse as per diagram below.
..
Next, we'll drop in the top side assemblies.
- Slide down the top side assembly until it is fully seated and the rear upright is flush with edge of the side assembly as per diagram below.
- Repeat for left hand side
- Tighten the M5X8.B in the channels for both sides.
Now, for some more glazing strip.
- Fit the glazing seal (V2S.GST) to the upright edges. The narrow short edge of the trim, outlined in green, slots between the glazing surface and the outer edge of the frame channel.
Start at one end and work the seal edge in ensuring the seal trim isn't bunched up. Use sharp scissors to cut the length required. - Secure the front corner bracket of the side assemblies to the top door bar using the M5X30 bolts, penny washer and M5 nyloc.
Previous: Prepare top side assemblies
Next: Fit the lid