Nursery heater
Parts
- 1x Nursery heater pad
Process
- Position the pad on the base of the unit, in the nursery section, with the cable facing backwards, towards the rear panel. It will lie under the drawer.
- Run the cable up behind the light and plug it into the socket on the controller marked “N.HEAT”.
- Peel the backing off the heater pad and fix the heater pad to the base of the nursery.
Nursery drawer
Parts
- 4x short screw
- 2x drawer slide inner parts
- 1x drawer
Process
- Screw the drawer slides to the sides of the drawer, with the drawer slide closed face resting up against the back of the drawer front.
- Slide the drawer carefully into the drawer runners that are already fitted to the main frame. You will hear a "click" when the drawer has gone in properly.
- Align the drawer if required, using the screws and slots in the drawer runners.
Tank panel & tank
Parts
- 1x Tank panel
- 4x short screw
- 2x magnetic catch plate
- 1x Water tank
Process
- Screw the catch plates onto the back of the tank panel using 2x short screw in each plate.
- Place the (empty) water tank positioned just in front of the tank cavity, with the black sensor socket on the left.
- Place the white EC sensor into the tank.
- Place the pump into the tank.
- Slot the black tank level sensor into the bracket on the tank.
- Push the tank all the way in.
- Place the tank panel onto the front of the unit so that the plates on the rear of the panel engage with the magnetic catches.
Previous : Lid
The frame assembly is now complete! Pat yourself on the back.
Next, we'll get the irrigation parts in place:
Start with Drains and Feed Pipes